DETAIL PRODUK
Flow Line
Konsentrasi Keahlian :
Teknik Pengeboran Minyak Dan Gas
Deskripsi :
Length: 6” to 10’ (15cm to 3m)
Adjustablity: None Fitting material:
PVC, PP or PVDF Process mount:
2” NPT (2” G)
Adjustablity: None Fitting material:
PVC, PP or PVDF Process mount:
2” NPT (2” G)
Anda menginginkan produk ini?
Hubungi Kami Sekarang
PRODUK LAINNYA
Wireline logging
Logging Probes Integrated Wall-Cling ProbeDsCD Logging (doub...
Geologi Pertambangan
,
Teknik Pengeboran Minyak Dan Gas
Deadline Anchor
Model MH 1083 080 = 150,000 lbs/Fix. Drum floor mounted, ten...
Teknik Pengeboran Minyak Dan Gas
Drilling Line
REEL Flange Tinggi max 108 in, REEL Lebar atau Panjang 65 in
Teknik Pengeboran Minyak Dan Gas
Flow Coupling
Tubing size 2.375", weight 4.6 lbm, OD max 3.063" ID max 1.9...
Teknik Pengeboran Minyak Dan Gas
Hydroulic Line
Applicable Range of Unit’s Head (in) : 2-3/8” - 7-5/8” Backu...
Teknik Pengeboran Minyak Dan Gas
Kill Line
Design specification o Above 3 1/16” API o At less than 5000...
Teknik Pengeboran Minyak Dan Gas